Adjust Jidoka Occupational Fatigue to Reduce Idle times using Data Mining as Lean Tool

Faculty Engineering Year: 2016
Type of Publication: ZU Hosted Pages: 7
Authors:
Journal: The Egyptian International Journal of Engineering Science and Technology EIJEST Volume: Vol. 19,
Keywords : Adjust Jidoka Occupational Fatigue , Reduce Idle    
Abstract:
The Jidoka Occupational fatigue represents a major threat for the continuation of the work because generating idle times then defects that disable the productivity for more than 1 day (eg., casual vacation). The main objective of Jidoka i
   
     
 
       

Author Related Publications

  • Ahmed Mohamed Elsayed Abdelwahab Abied, "Improve six-sigma management by forecasting production quantity using image verification quality tool", International journal of advances in engineering and technology, 2011 More
  • Ahmed Mohamed Elsayed Abdelwahab Abied, "Minimize Make-span for machine sequencing of jobs with precedence constraints", Academy of scientific research & Technology, Egypt, 2003 More
  • Ahmed Mohamed Elsayed Abdelwahab Abied, "Application Of Cellular Manufacturing Formation To The Automotive Industries", AL-Azhar University Engineering Journal AUEJ, 2004 More
  • Ahmed Mohamed Elsayed Abdelwahab Abied, "Layout Designs In Cellular Manufacturing", AL-Azhar University Engineering Journal AUEJ, 2004 More
  • Ahmed Mohamed Elsayed Abdelwahab Abied, "Developing LEAN manufacturing using Automatic identification and data capture(AIDC)", AUC-Egypt Engineering 5th International Conference, Egypt, 2006 More

Department Related Publications

  • Adel Abdelmoaz, "Layout Designs In Cellular Manufacturing", The 8th International Conference of Al-Azhar University, 2004 More
  • Rafat Hessien Elsayed Elshaer, "Mostafa Ashour, Raafat Elshaer, Multi-Echelon Reverse Supply Chain Network Design using New Ant Colony Optimization Algorithms, Int. J. Operational Research, (Accepted paper, 2022).", Inderscience Enterprises, 2022 More
  • Rafat Hessien Elsayed Elshaer, "Hala Ahmed, Mahassen Khater and Raafat Elshaer “New Order-picking Routing Heuristics for Single Block Rectangular Warehouse”, International Journal of Industrial and Systems Engineering, (Accepted paper, 2022).", Inderscience Enterprises, 2022 More
  • Rafat Hessien Elsayed Elshaer, "Hala Ahmed, Mahassen Khater and Raafat Elshaer “New Order-picking Routing Heuristics for Single Block Rectangular Warehouse”, International Journal of Industrial and Systems Engineering, (Accepted paper, 2022).", Inderscience Enterprises, 2022 More
  • Gamal Mohamed Ahmed Nawar, "RESOURCE ALLOCATION ALGORITHM FOR ROBUST PROJECT SCHEDULING", لايوجد, 1900 More
Tweet