Impact of Genetic Algorithm Operators on its performance for solving Flow Shop Scheduling problem

Faculty Engineering Year: 2013
Type of Publication: ZU Hosted Pages:
Authors:
Journal: The Egyptian International Journal of Engineering Sciences and Technology zagazig university Volume:
Keywords : Impact , Genetic Algorithm Operators , , performance , solving    
Abstract:
The primary objective of flow shop scheduling is to obtain the best sequence which optimizes various objectives such as makespan, total flow time, total tardiness, or number of tardy jobs, etc. Due to the combinatorial nature of the flow sh
   
     
 
       

Author Related Publications

  • Rafat Hessien Elsayed Elshaer, "An Effective Genetic Algorithm for Capacitated Vehicle Routing Problem", IEOM society, 2018 More
  • Rafat Hessien Elsayed Elshaer, "Azza Gaber, Raafat Elshaer and Mahassen Khater, “An Ant Colony Optimization Heuristic for Solving the Two-Dimensional Level Packing Problems”, Proceedings of the International Conference on Industrial Engineering and Operations Management Bandung, Indonesia, March 6-8, 2018.", IEOM society, 2018 More
  • Rafat Hessien Elsayed Elshaer, "Mostafa Ashour, Raafat Elshaer, Gamal Nawara, “Ant Colony Approach for Optimizing a Multi-stage Closed-Loop Supply Chain with a Fixed Transportation Charge”, Journal of Advanced Manufacturing Systems, 2021, 1-24.", World Scienti¯c Publishing Company, 2021 More
  • Rafat Hessien Elsayed Elshaer, "Raafat Elshaer, Impact of Project Network Topology on the Performance of Schedule Generation Schemes: Comparative Study, Int. J. Operational Research, (in press, 2022).", Inderscience Enterprises, 2022 More
  • Rafat Hessien Elsayed Elshaer, "Mostafa Ashour, Raafat Elshaer, Multi-Echelon Reverse Supply Chain Network Design using New Ant Colony Optimization Algorithms, Int. J. Operational Research, (Accepted paper, 2022).", Inderscience Enterprises, 2022 More

Department Related Publications

  • Rafat Hessien Elsayed Elshaer, "BASELINE SCHEDULE AND STABILITY OF RESOURCE-CONSTRAINED PROJECTS UNDER UNCERTAINTY ", لايوجد, 1900 More
  • Rafat Hessien Elsayed Elshaer, "Resource Allocation Algorithm for Robust Project scheduling", لايوجد, 1900 More
  • Sarah Atif Abdulaziz Ali , "A Comparative Study Using Deep Learning and Support Vector Regression for Electricity Price Forecasting in Smart Grids", IEEE, 2019 More
  • Mostafa Abdelsalam Musstafa, "Multi-Echelon Reverse Supply Chain Network Design using New Ant Colony Optimization Algorithms", Inderscience, 2022 More
  • Rafat Hessien Elsayed Elshaer, "Multi-Echelon Reverse Supply Chain Network Design using New Ant Colony Optimization Algorithms", Inderscience, 2022 More
Tweet